亚洲精品无码久久久久久久按摩,精品久久人人做人人爽综合,久久伊人91精品综合网站,99在线精品视频在线播放,欧洲熟妇色欧美老妇多毛视频

NHI Headlines

NHI "Cooperation 2" Tunnel Boring Machine Starts Tunneling

Published:2016-07-06

On April8th morning, along with a "rumble" roar, NHI "Cooperation2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site ofCulture West Road Station of metro line 10. Compared with other TBM, this TBMmade by NHI is more humane with reasonable spatial distribution and its cutter parametersare more suitable for Shenyangsoil. "Cooperation 2" TBM complete the installation of 20 ringsegments within 24 hours. It is equivalent of tunneling 24 meters, by an averageof tunneling one meter per hour.